{"id":4916,"date":"2023-09-08T05:28:16","date_gmt":"2023-09-08T05:28:16","guid":{"rendered":"https:\/\/volleyballvnl.com\/?p=4916"},"modified":"2023-09-08T05:28:16","modified_gmt":"2023-09-08T05:28:16","slug":"wartsila-supplies-automation-improve-for-iconic-energy-plant-in-cameroon","status":"publish","type":"post","link":"https:\/\/volleyballvnl.com\/?p=4916","title":{"rendered":"W\u00e4rtsil\u00e4 supplies automation improve for iconic energy plant in Cameroon"},"content":{"rendered":"\n<p>The know-how group W\u00e4rtsil\u00e4 will carry out an upgrading challenge of the electrical and automation techniques to make sure optimum reliability of the Kribi power plant within the Republic of Cameroon.<br\/>The 216 MW plant has been in operation for almost ten years, working with 13 W\u00e4rtsil\u00e4 50DF dual-fuel engines running primarily on pure fuel. At the time of commissioning, it was the biggest fuel engine energy plant in Sub-Saharan Africa. W\u00e4rtsil\u00e4 may also assist the customer\u2019s operational and maintenance efficiency with a 10-year long-term service settlement.<br\/>The order with W\u00e4rtsil\u00e4 was placed by Kribi energy development company (KPDC), a subsidiary of Globeleq, an impartial power producer (IPP) and the owner and operator of power generating facilities throughout Africa. The order shall be booked in W\u00e4rtsil\u00e4\u2019s order consumption in Q3\/2022.<br\/>\u201cThe Kribi power plant has a significant role throughout the African energy sector. It continues to be today supplying two-thirds of the thermal power in Cameroon. Cameroon\u2019s energy system relies heavily on hydropower, but has uncertain sources of water. The Kribi plant, subsequently, plays a key role in guaranteeing a provide of protected, low-cost, and reliable energy. For this reason we&#8217;re eager to improve the power plant\u2019s automation systems to the latest design to ensure optimum reliability, and to strengthen our cooperation with W\u00e4rtsil\u00e4, leveraging their competences on a steady foundation throughout the framework of the long-term service settlement,\u201d commented Gionata Visconti, Chief Operating Officer, Globeleq.<br\/>\u201cW\u00e4rtsil\u00e4 has a powerful regional presence, which allows us to provide valuable technical support that optimises engine performance and maximises the manufacturing capabilities of this energy plant which has such a major function in Cameroon\u2019s energy provide. We are additionally in a position to ensure the supply of important spare parts, and this is a vital component throughout the long-term service agreement between our corporations. All in all, this is a essential challenge, each for the client and for W\u00e4rtsil\u00e4,\u201d mentioned Markus Ljungkvist, Vice President, Services, W\u00e4rtsil\u00e4 Energy.<br\/>The venture is scheduled to commence in 2023. To ensure  <a href=\"http:\/\/pressuregaugeonly.com\">\u0e2b\u0e25\u0e31\u0e01\u0e01\u0e32\u0e23\u0e17\u0e4d\u0e32\u0e07\u0e32\u0e19\u0e02\u0e2d\u0e07pressuregauge<\/a>  of the plant\u2019s output, the work might be carried out on one engine at a time. The long-term service agreement contains remote operational help, upkeep planning, technical advisory and remote troubleshooting providers, in addition to spare components.<br\/>Long-term service agreements are an integral part of W\u00e4rtsil\u00e4\u2019s lifecycle services offering. They are primarily based on utilisation of the latest digital technologies, and supported by the company\u2019s in depth know-how and understanding of power generation installations.<br\/>W\u00e4rtsil\u00e4 has altogether provided 550 MW of generating capability to the Republic of Cameroon, and 7.5 GW to the entire of Africa, of which more than 25 per cent are covered by W\u00e4rtsil\u00e4 service agreements.<br\/>Share<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The know-how group W\u00e4rtsil\u00e4 will carry out an upgrading challenge of the electrical and automation techniques to make sure optimum reliability of the Kribi power plant within the Republic of Cameroon.The 216 MW plant has been in operation for almost ten years, working with 13 W\u00e4rtsil\u00e4 50DF dual-fuel engines running primarily on pure fuel. At [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4916","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts\/4916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4916"}],"version-history":[{"count":1,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts\/4916\/revisions"}],"predecessor-version":[{"id":4917,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts\/4916\/revisions\/4917"}],"wp:attachment":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}