{"id":6150,"date":"2023-09-23T04:10:25","date_gmt":"2023-09-23T04:10:25","guid":{"rendered":"https:\/\/volleyballvnl.com\/?p=6150"},"modified":"2023-09-23T04:10:25","modified_gmt":"2023-09-23T04:10:25","slug":"wartsila-offers-automation-improve-for-iconic-power-plant-in-cameroon","status":"publish","type":"post","link":"https:\/\/volleyballvnl.com\/?p=6150","title":{"rendered":"W\u00e4rtsil\u00e4 offers automation improve for iconic power plant in Cameroon"},"content":{"rendered":"\n<p>The technology group W\u00e4rtsil\u00e4 will perform an upgrading project of the electrical and automation techniques to ensure optimum reliability of the Kribi power plant in the Republic of Cameroon.<br\/>The 216 MW plant has been in operation for practically ten years, operating with thirteen W\u00e4rtsil\u00e4 50DF dual-fuel engines working totally on pure fuel. At the time of commissioning, it was the largest gasoline engine energy plant in Sub-Saharan Africa. W\u00e4rtsil\u00e4 will also help the customer\u2019s operational and upkeep performance with a 10-year long-term service settlement.<br\/>The order with W\u00e4rtsil\u00e4 was placed by Kribi power growth firm (KPDC), a subsidiary of Globeleq, an independent power producer (IPP) and the proprietor and operator of power generating amenities across Africa. The order might be booked in W\u00e4rtsil\u00e4\u2019s order consumption in Q3\/2022.<br\/>\u201cThe Kribi energy plant has a significant function inside the African energy sector. It is still at present supplying two-thirds of the thermal energy in Cameroon. Cameroon\u2019s power system relies heavily on hydropower, but has unsure assets of water. The Kribi plant, subsequently, plays a key role in guaranteeing a supply of secure, cheap, and reliable vitality. For this reason we&#8217;re keen to improve the ability plant\u2019s automation systems to the most recent design to make sure optimum reliability, and to strengthen our cooperation with W\u00e4rtsil\u00e4, leveraging their competences on a continuous foundation inside the framework of the long-term service agreement,\u201d commented Gionata Visconti, Chief Operating Officer, Globeleq.<br\/>\u201cW\u00e4rtsil\u00e4 has a robust regional presence, which allows us to provide valuable technical support that optimises engine efficiency and maximises the manufacturing capabilities of this power plant which has such a big position in Cameroon\u2019s power provide. We are also ready to ensure the supply of crucial spare elements, and that is an important element throughout the long-term service agreement between our companies. All in all, it is a essential project, each for the shopper and for W\u00e4rtsil\u00e4,\u201d mentioned Markus Ljungkvist, Vice President, Services, W\u00e4rtsil\u00e4 Energy.<br\/>The project is scheduled to start in 2023. To ensure the continuity of the plant\u2019s output, the work will be carried out on one engine at a time. The long-term service settlement consists of distant operational assist, maintenance planning, technical advisory and distant troubleshooting providers, as nicely as spare components.<br\/> <a href=\"http:\/\/\u0e44\u0e14\u0e2d\u0e30\u0e41\u0e1f\u0e23\u0e21.com\">\u0e2b\u0e25\u0e31\u0e01\u0e01\u0e32\u0e23\u0e17\u0e4d\u0e32\u0e07\u0e32\u0e19\u0e02\u0e2d\u0e07pressuregauge<\/a> -term service agreements are an integral part of W\u00e4rtsil\u00e4\u2019s lifecycle providers providing. They are based on utilisation of the newest digital applied sciences, and supported by the company\u2019s extensive know-how and understanding of energy technology installations.<br\/>W\u00e4rtsil\u00e4 has altogether equipped 550 MW of generating capability to the Republic of Cameroon, and 7.5 GW to the whole of Africa, of which more than 25 per cent are lined by W\u00e4rtsil\u00e4 service agreements.<br\/>Share<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The technology group W\u00e4rtsil\u00e4 will perform an upgrading project of the electrical and automation techniques to ensure optimum reliability of the Kribi power plant in the Republic of Cameroon.The 216 MW plant has been in operation for practically ten years, operating with thirteen W\u00e4rtsil\u00e4 50DF dual-fuel engines working totally on pure fuel. At the time [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6150","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts\/6150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6150"}],"version-history":[{"count":1,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts\/6150\/revisions"}],"predecessor-version":[{"id":6151,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=\/wp\/v2\/posts\/6150\/revisions\/6151"}],"wp:attachment":[{"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/volleyballvnl.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}